Case Study - Roof Manufacturing

March 27

A large fibre glass roofing manufacturer in the North West began a project in Summer 2013 to build a new line to increase production. Starting from scratch in an empty building they began the design and installation of the distribution tanks along with associated galvanised pipe work.


Working closely with the engineers at Northern Engineering (Wigan), we supplied all the limit switches, solenoids, ball valves, 2" and 3" bends, actuators, chemical transfer hose and pipe work for the whole project.


Due to the changing nature of the job it was imperative that we could react quickly to changes in design, very often delivering the same day to ensure the completion date was achieved.


The job was finished January 2014 and production is beginning after commissioning.


Case Study - Roof Manufacturing